CONCRETE LEG INTERVENTION AND INSPECTION ON BRENT CHARLIE
Project Overview
AquaTerra successfully carried out concrete column and sub gas tight floor intervention, cell fill lines, manifolds, critical weld root inspection, riser work, various pipe work including bond strand pipe work inspection and the survey for and installation of cathodic protection. AquaTerra has extensive experience with Shell working in their concrete legs from 2004 onwards.
This is off canvas menu widget area. To enable it add some widgets into Appearance – Widgets – Menu Section, and go to Customizer – Main menu to set the icon position.