CONCRETE LEG INTERVENTION AND INSPECTION ON BRENT CHARLIE

Project Overview

AquaTerra successfully carried out concrete column and sub gas tight floor intervention, cell fill lines, manifolds, critical weld root inspection, riser work, various pipe work including bond strand pipe work inspection and the survey for and installation of cathodic protection. AquaTerra has extensive experience with Shell working in their concrete legs from 2004 onwards.